Topcon Drill Rig
Make | Topcon |
Model | Drill Rig |
Type | 2D Excavator Systems |
How can we help?
Description
Increase drilling efficiency
The DR-53i Drill Rig Indicate System provides navigation assistance, pattern design wizards and visible indicators letting operators know they are at the right spot and angle to start their hole. Design files can be uploaded, or 3D-MC lets the operator manually create or modify hole specifications. Sitelink3D adds additional capabilities including the ability to remotely share files or support the operator when training is needed or the unexpected occurs.
Models
Applications
- Mass Excavation
- Site Work
- Mining
Overview
Benefits
- Reduce surveying time, delays and costs
- Less time spent marking holes and pounding hubs
- Time spent in the cab is more efficient
- File conversion and immediate upload of change orders
- Minimize the need for additional personnel on job site
- Volume calculation can reduce unexpected downtime and increase accuracy of estimates
Features
- Remote support and file transfers via Sitelink3D Support Desk
- Staggered rows
- Tilting feeder
- From points
- Support for different configurations: Swing boom Single or double boom Extending/sliding feeder Tilting feeder
- Depth from design surface
- Navigation assistance Angle of attack Direction of the feeder Bullseye
- Single or double boom
- Swing boom
- Direction of the feeder
- Automatic hole numbering
- Bullseye
- Rectangular grid
- Parallel to alignment
- Angle of attack
- Work from predesigned files
- Extending/sliding feeder
- Create designs on the fly or via pattern creation wizard Rectangular grid Staggered rows From points Parallel to alignment Automatic hole numbering Depth from design surface
Links
Copy Set
Applications
- Mass Excavation
- Site Work
- Mining
Overview
Benefits
- Reduce surveying time, delays and costs
- Less time spent marking holes and pounding hubs
- Time spent in the cab is more efficient
- File conversion and immediate upload of change orders
- Minimize the need for additional personnel on job site
- Volume calculation can reduce unexpected downtime and increase accuracy of estimates